OPERATIONS AND PIT BUILDING

 The pit building, the operational hub of the track, is a multifunctional facility with garages that serve the track users as well as a multi-use space on the first floor that includes a restaurant, a hospitality area and a Members Club Lounge. The Operations and Pit Building, including interiors, has been designed by Serie Architects.

Ground Floor

  • Day to day parking for 30 cars outside the building.
  • Garages with open spaces on a 6-7m wide grid and 5m door width. 3 bays to be used for scrutineering.
  • Total length: 105m. Height: 5m. Depth: 18m.
  • External staircase. Garages in blocks of 5, with access to central WC.
  • Medical room.

FIRST Floor

  • Stewards room / timing / administrative and management offices.
  • Outside terrace for track viewing.
  • Food and beverage service (café / restaurant).
  • WCs and changing rooms.
  • Media centre for 200 persons (day to day 50 person briefing room / 150 person seating for corporate dinners and events).
  • Lounge room for VIPs (50 person seating).

PADDOCK

  • Direct access to pit building and links to either side of paddock.
  • Lined with trees and separated from testing lanes.
  • Different sections for testing facilities / West Circuit and Members Club / East Circuit.
  • Scrutineering bays, secure holding areas, parc ferme.
  • RC car track for kids to race remote controlled cars.